Title:RAF COMBAT CAMERA TEAM MASTERS TAPE 4 [Allocated Title]
Film Number:BFV 487
Other titles:BRITISH MILITARY OPERATIONS IN IRAQ, 2004 [Allocated Series Title]
Summary: Master copies of various RAF Combat Camera Team jobs.
Description: I. Job 019: water injection project, Rumaila Oilfields, 9 March 2004.
II. Job 020: HMS St Albans, Bahrain.
III. Job 021: Reuters footage of the aftermath of a VBIED (Vehicle-Based Improvised Explosive Device), Basra, 2004.
IV. Job 017: clearing of ammunition dump at Tallil, near An Nasiriyah, 6 March 2004.
V. Job 023: completion of the Cullingworth Bridge over the Shatt al-Arab, Basra, March 2004.
Alternative Title:BRITISH MILITARY OPERATIONS IN IRAQ, 2004 [Allocated Series Title]
Colour:Colour
Digitised:
Object_Number:BFV 487
Sound:Sound
Access Conditions:IWM
Featured Period:
Production Date:2004-03-09 2004-03-06
Production Country: GB
Production Details: Defence Media Operations Centre, RAF Uxbridge (RAF Combat Camera Team) (Production company)
Personalities, Units and Organisations:
Keywords: Iraq post-2003 (theme)
Physical Characteristics: Colour format: Colour
Sound format: Sound
Soundtrack language: English
Title language: None
Subtitle language: None
Technical Details: Format: DVCam
Number of items/reels/tapes: 1
Tape length: 94
BFV 438 (WATER INJECTION PROJECT, RUMAILA OILFIELDS, 9 MARCH 2004 [Allocated Title])
BFV 470 (HMS ST ALBANS, BAHRAIN [Allocated Title])
BFV 439 (AFTERMATH OF A CAR BOMB IN BASRA, 2004 [Allocated Title])
BFV 437 (CLEARING OF AMMUNITION DUMP AT TALLIL, NEAR AL NASIRIYAH, 6 MARCH 2004 [Allocated Title])
BFV 440 (COMPLETION OF THE CULLINGWORTH BRIDGE OVER THE SHATT AL-ARAB, BASRA, MARCH 2004 (TAPE 1) [Allocated Title])
BFV 441 (COMPLETION OF THE CULLINGWORTH BRIDGE OVER THE SHATT AL-ARAB, BASRA, MARCH 2004 (TAPE 2) [Allocated Title])