Other titles:PORTON DOWN TRIALS NITRATE COLLECTION [Allocated Series Title]
Summary:
Description: Item 1: "Programme 43/52. 10 October 1952. Energa grenade against Comet tank. 40 fps with 3-inch lens."
Item 2: "Programme 34/52. 10 September 1952. 25 pdr shell charged G B. Round 1."
Item 3: "Programme 34/52. 10 September 1952. 25 pdr shell charged G B. Round 2."
Item 4: "Programme 32/52. 30 October 1952. 25 pdr against T34 tank. 40 fps. 3" lens."
Item 5: "Programme 37/52. 1 December 1952. Trial of the Red Admiral fuze. 100 fps. 3" lens. Vinten." Testing by Microbiological Research Department of biological bomb for use against civilian targets [before cancellation of this Air Ministry project in July 1954].
Alternative Title:PORTON DOWN TRIALS NITRATE COLLECTION [Allocated Series Title]