Other titles:PORTON DOWN TRIALS NON-NITRATE COLLECTION [Allocated Series Title]
Summary:
Description: Design and construction: animated diagram of principles of operation: distant view of chamber. CU view of chamber building: operating team entering chamber: top of chamber showing handling box: general views of sphere: removal of sphere access cover: operator entering sphere by ladder: interior of sphere showing mixing fans, drainage outlets, and sampling vents: details of connections on outside of sphere: details of sampling equipment: details of operating team tasks in sampling room including introduction of lab animals: G. Pigs placed in racks in sampling console: details of sampling connections to chamber also effluent outlet system: effluent disposal system in basement incinerators and controls: Temperature gauges etc: details of air burner for effluent destruction: Operating team arriving at chamber: team dressing full protective clothing and respirators: central control system: arrival of personnel to introduce toxic material to chamber: Toxic material handling procedure at top of sphere: aerosol dispenser introduced to chamber and functioning: sampling procedure: basement equipment for effluent control: operation control at main switching console; general operating procedure: bubblers operating at sampling face: removal of samples for laboratory assessment. Personnel undressing routine: autoclaving dirty protective clothing: samples removed from chamber for assessment in MRE.
Alternative Title:PORTON DOWN TRIALS NON-NITRATE COLLECTION [Allocated Series Title]