Summary: Unedited rushes of a rubber tracking system being fitted to a FV103 Spartan.
Description: Tape 1: Spartan raised up in the workshop at DERA Chertsey. Work begins on fitting the tracking.
Tape 2: Work continues on fitting the rubber tracking.
Tape 3: Once the tracking is fully fitted, the Spartan is driven out of the workshop and makes several laps on the apron outside the workshop, watched by a small audience.