Summary: A technical film by the Directorate of Engineer Development (Canada) describing trials in May 1945 of the Canadian light alloy assault bridge, which provides a 100 ft unsupported span capable of carrying a jeep and an 6-pounder assault gun. The tests were carried out by members of the Royal Canadian Engineers.
Description: Part I. Bridge sections are unloaded from a truck. After assembly, the bridge is launched across a gap, using a second bridge section as a counterweight. Loading trials and inspection. Dismantling of bridge.
Part II. Further bridge is laid (this time a heavier duty version); live load trials.
Part III. Launching over a 120 ft wet gap using articulating connections and American pontoons. Live load tests