We use cookies on this website.
By continuing to use this site without changing your cookie settings,
you agree that you are happy to accept our privacy policy
and for us to access our cookies on your device.
Other titles:PONTOON ASSEMBLY AND UTILISATION [Series Title]
Summary: A survey of the installation of the adjustable boat cradle on a standard 4 x 15 Pontoon Floating Drydock.
Description: Step by step guide to the assembly and attachment of the boat cradle. Lines of blocking frame units are laid down along the floor of the dock, onto which movable cradle supports are attached athwart ships. Cradle arms and cradle arm braces follow.
Alternative Title:PONTOON ASSEMBLY AND UTILISATION [Series Title]
Colour:B&W
Digitised:
Object_Number:ADM 237
Sound:Sound
Access Conditions:IWM
Featured Period:1939-1945
Production Date:1943
Production Country: United States of America
Production Details: Bureau of Yards and Docks (Production sponsor)
Sound Masters under supervision of Bureau of Aeronautics (Production company)
Personalities, Units and Organisations:
Keywords: engineering, military, United States: Pontoon Floating Drydock (object name)
Physical Characteristics: Colour format: B&W
Sound format: Sound
Soundtrack language: English
Title language: English
Subtitle language: None
Technical Details: Format: 35mm
Number of items/reels/tapes: 2
Footage: 1240 ft; Running time: 14 mins